Extron-electronics PoleVault Systems PVS 305SA Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Hardware Extron-electronics PoleVault Systems PVS 305SA. Extron Electronics PoleVault Systems PVS 305SA User Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 46
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
PoleVault
®
Systems
(featuring the PVS 305SA)
Installation Guide
68-1691-01
Rev. A
08 09
ALSO AVAILABLE:
The PoleVault
®
System
Installation Video.
View it at www.extron.com.
Vista de página 0
1 2 3 4 5 6 ... 45 46

Resumo do Conteúdo

Página 1 - Systems

PoleVault® Systems(featuring the PVS 305SA)Installation Guide68-1691-01 Rev. A08 09ALSO AVAILABLE:The PoleVault® SystemInstallation Video.View it at

Página 2 - Precautions

Introduction — Inventory Overview, cont’d1-8PoleVault Systems Installation • Introduction — Inventory Overview1-8b. Items not includedThe following i

Página 3 - Introduction

1-9PoleVault Systems Installation • Introduction — Inventory Overview 1-9 d. Installation toolsTo aid the professional installer, this checklist give

Página 4 - Introduction, cont'd

PoleVault Systems Installation • Installation2-1Installation OverviewThis overview outlines the basic steps for installing the PoleVault System. Deta

Página 5 - 1. Room layout

PoleVault Systems Installation • Installation — Stage 12-2Stage One — Install the Screen and ProjectorStage 1 This stage involves installing the thre

Página 6 - Walking Parallel to a Wall

PoleVault Systems Installation • Installation — Stage 12-3Installation — Stage One, cont’d1. Mark screen locationa. Mark the center line and the oute

Página 7 - Controller and Wall Plates

2-4PoleVault Systems Installation • Installation — Stage 1 e. Using suitable screws, mount the projector onto the projector bracket, i.e., the lower

Página 8 - 2. Inventory

PoleVault Systems Installation • Installation — Stage 12-5Installation — Stage One, cont’d4. Cut the ceiling tilea. Mark the location of the PCM 340

Página 9 - PoleVault System Devices

2-6PoleVault Systems Installation • Installation — Stage 1 6. Finish Projector Drop Ceiling Mount installationa. Detach the projector bracket/project

Página 10 - — Inventory Overview, cont’d

PoleVault Systems Installation • Installation — Stage 12-7Installation — Stage One, cont’d8. Install the electrical box (if required)W All electrical

Página 11

2-8Stage Two — Install the Wall Plates and MLC 104 IP PlusStage 2This stage involves installing the devices shown below.Audio and VideoOutput Port (at

Página 12 - Installation Overview

This symbol is intended to alert the user of important operating and maintenance (servicing) instructions in the literature provided with the equipmen

Página 13 - (Top Section)

PoleVault Systems Installation • Installation — Stage 22-9Installation — Stage Two, cont’d PVT transmitter installation • CAT 5 T568A signal transmi

Página 14 - 1. Mark screen location

2-10PoleVault Systems Installation • Installation — Stage 2 N The installation must conform to national and local building and electrical codes, an

Página 15 - 3. Verify the image location

PoleVault Systems Installation • Installation — Stage 22-11Installation — Stage Two, cont’d2. Pull the cables (at the input locations)The following c

Página 16 - 4. Cut the ceiling tile

2-12PoleVault Systems Installation • Installation — Stage 2 3. Install wall platesa. Connect the CAT 5 cables to the rear of the input devices (for R

Página 17 - (from either side)

PoleVault Systems Installation • Installation — Stage 22-13Installation — Stage Two, cont’d4. Install MediaLink ControllerT Before cabling and instal

Página 18 - 9. Install the Screen

2-14PoleVault Systems Installation • Installation — Stage 2 b. Connect the IR/RS-232 projector communication cable as shown for either RS-232 or IR p

Página 19 - Rear View

PoleVault Systems Installation • Installation — Stage 22-15Installation — Stage Two, cont’dExtronMLC 104 IP PlusRotate locking armand insert into wall

Página 20

2-16PoleVault Systems Installation • Installation — Stage 2Stage Three — Install the FF 120 Ceiling SpeakersStage 3This stage involves installing the

Página 21 - 1. Install the mud rings

PoleVault Systems Installation • Installation — Stage 32-17Installation — Stage Three, cont’dN The installation must conform to national and local

Página 22 - Signal Cable Label color

2-18PoleVault Systems Installation • Installation — Stage 3 4c Wire the captive screw connector.PVS SwitcherRear PanelSpeaker 1 Speaker 2LR4/8OhmsAMPL

Página 23 - 3. Install wall plates

1-1PoleVault Systems Installation • IntroductionIntroductionOverviewThis guide covers the installation of the Extron PoleVault® System in a drop ceili

Página 24 - RS-232/MLC/IR

PoleVault Systems Installation • Installation — Stage 42-19Stage Four — Install the PMK 550 and the PVS 305SAStage 4This stage covers installing the d

Página 25 - IR Cable color

2-20PoleVault Systems Installation • Installation — Stage 4 PVS 305SA and power supply on the PMK 550 base plate (inverted)2d Slide the base plate up

Página 26 - Projector

PoleVault Systems Installation • Installation — Stage 42-21Installation — Stage Four, cont’d2b Gather the cables, pass them down the pipe. PoleVault

Página 27 - FF 120 Speaker (2)

2-22PoleVault Systems Installation • Installation — Stage 4 LRLRLRAUX AUDIOINPUT 5LINE OUTVOICELIFTRECEIVERPAGINGSENSORDO NOTGROUNDOR SHORTSPEAKEROUTP

Página 28 - 1. Cut ceiling tile

PoleVault Systems Installation • Installation — Stage 42-23Installation — Stage Four, cont’db. Screw the UPB 25 adjuster plate back onto the base of

Página 29 - Speaker 1 Speaker 2

2-24PoleVault Systems Installation • Installation — Stage 5Stage Five — Congure the Switcher and the System1. Congure the switcher — MLS Switcher Co

Página 30 - V RCA, 3 ft

PoleVault Systems Installation • Installation — Stage 52-25Installation — Stage Five, cont’d2. Congure the system — Global Configuratora. Download an

Página 31

2-26PoleVault Systems Installation • Installation — Stage 5 3. Test the systema. Connect all the input devices (e.g., PC, DVD, document camera, etc

Página 32

PoleVault Systems Installation • Installation — Stage 52-27Installation — Stage Five, cont’dd. Test the controller’s configuration with the following:

Página 33 - Receive (Rx)

3-1PoleVault Systems Installation • Optional Accessory InstallationOptional Accessory Installation — VoiceLift SystemThe Extron VoiceLift system is an

Página 34

PoleVault Systems Installation • Introduction1-2Introduction, cont'dPVS 305SAPOLEVAULT SWITCHERINPUT SELECTION12PEAKNORMALSIGNALCONFIG3 45AUX AUD

Página 35 - Conguration program

PoleVault Systems Installation • Optional Accessory Installation3-2Optional Accessory Installation — Priority Page Sensor KitThe Priority Page Sensor

Página 36 - Configurator

3-3PoleVault Systems Installation • Optional Accessory Installation LRLRLRAUX AUDIOINPUT 5LINE OUTPAGINGSENSORDO NOTGROUNDOR SHORTSPEAKEROUTPUTSRS-232

Página 37 - 3. Test the system

4-1SpecicationsFor detailed specications and warranty information of the PoleVault System components, refer to the device manuals, or the product pa

Página 38 - 4. Final installation

4-2PoleVault Systems Installation • Reference Information Regulatory complianceSafety ... CE, c-UL, UL UL rated for u

Página 39 - VoiceLift

PoleVault Systems Installation • Reference Information4-3Reference Information, cont’dPower Supply(included withPVS switcher)weight 0.9 lbs (0.4 kg)Ex

Página 40

SIS Command/Response Table Command ASCII (Telnet) (host - switcher)Response(switcher to host)Video ConfigurationSet the video signal typeX!* X2# \ Typ

Página 41 - PVS 305SA

Extron USA - West Headquarters+800.633.9876Inside USA / Canada Only+1.714.491.1500+1.714.491.1517 FAXExtron USA - East+800.633.9876Inside USA / Canada

Página 42 - Specications

1-3PoleVault Systems Installation • Introduction — Planning Before you Begin Installation - PlanningBefore installation is started, several major fact

Página 43 - MLC 104 IP Plus

PoleVault Systems Installation • Introduction — Planning1-4Introduction — Planning, cont’d• Lighting  Type and control (important for projector ima

Página 44 - Reference Information, cont’d

1-5PoleVault Systems Installation • Introduction — Planning c. Location of MediaLink® Controller and Wall Plates• Forward and side reach (for full d

Página 45 - (switcher to host)

PoleVault Systems Installation • Introduction — Inventory Overview1-6Introduction — Inventory OverviewUPB 25 White60-773-03UPB 25Universal Projector B

Página 46 - Outline of installation steps

1-7PoleVault Systems Installation • Introduction — Inventory Overview PoleVault System42-108-03 (or 42-109-03*, or 42-110-03*)MLC 104 IP PlusMediaLink

Comentários a estes Manuais

Sem comentários